Design and development and Surveying


2009

Were performed design and development, surveying work for the development of working projects for the construction of water supply systems of settlements of the Karaganda region.

Settlements pre-survey carried out on the scale of 1:500 and 1:2000 with the use of modern electronic tachymeter and GPS receivers.

The data are processed by using AutoCAD software, visualized and used for design work on the laying of water pipelines. During the work carried out and produced a control work and performing shooting.


Back to all projects